Place the Truline Dowel Cap onto each dowel and insert
the dowels through the keyjoint. Clip
the dowel cap to a chaired support bar and grease half
of the dowel length prior to pouring the concrete. To allow
the dowel to move freely within the slab it must be the
section of dowel that the cap is applied to that is greased.